Jan De Nul Group and Ørsted have signed the export cable contract for the Hornsea 3 offshore wind farm in the UK. Jan De Nul Group will be responsible for the seabed preparation, transport, installation and protection of 350 km of DC export cables connecting the wind farm to the UK electricity grid. 

The Hornsea 3 offshore wind farm is located 160 km off the Yorkshire coast in the UK. With its 2.9 GW capacity, this wind farm will become the largest individual offshore wind farm to date and will bring the total capacity of the Hornsea offshore wind zone to 5.4 GW, the world’s largest. 

The two DC export cables will have a combined length of 350 km and connect the wind farm to the national electricity grid. Hornsea 3 will generate enough renewable electricity to power the homes of 3.3 million British households.

Wouter Vermeersch, manager offshore cables at Jan De Nul Group: “We are proud to support Ørsted in building the world’s largest individual offshore wind farm by connecting 2.9 GW of renewable energy capacity to the UK’s national grid. Thanks to our collaboration with Ørsted, which includes recent projects such as the monopile installations for Gode Wind 3 and Borkum Riffgrund 3 in Germany, we keep on constructing the energy transition together.”

Jan De Nul Group deploys several vessels to provide the best service.

Thanks to its extensive and diverse offshore fleet, Jan De Nul Group provides the optimal services to help its customers in their transition to renewable energy. For the installation and protection of the DC export cables, the company is going to deploy several vessels. Cable-laying vessels Isaac Newton and Connector will transport and install the cables, and to protect the cables a variety of burial solutions will be used including the rock-installation vessel Simon Stevin which will install up to 150,000 tonnes of rock to protect the cables. The works will start in 2025 and are expected to be completed early 2027.

Afbeelding
jan de nul en orsted

Related news

Volvo Car Gent is testing automated shunting – for more sustainable and efficient port transport

27 March, 2026

Over 660 journeys a day. That is the number of lorry journeys for incoming and outgoing goods and products – covering some 21,000 km, the majority of which are currently carried out by diesel lorries – that Volvo Car Gent generates every day on and around its site in the port area. To make these operations more sustainable, safer, but above all more efficient, the car manufacturer wants to test whether some of these journeys could be carried out autonomously in the future.

Gent

New charging hub for electric trucks at Volvo site strengthens sustainable logistics in North Sea Port

5 March, 2026

Yesterday, a new public charging hub for electric trucks was inaugurated at the Volvo site in Ghent. The infrastructure was developed by Milence, in collaboration with the Volvo Group. The charging site is an important part of a broader zero-emission mobility hub in North Sea Port, where Air Products is building a hydrogen refuelling station at the same location.

Ronald-Koen-Volvo Trucks.jpg

CO₂ capture at Knippegroen: ENGIE investigates feasibility in industrial practice

19 December, 2025

ENGIE is testing a demonstration plant for CO₂ capture (CCU) at the Knippegroen power station in the port of Ghent. The aim is to determine whether it is technically and economically feasible to extract CO₂ directly from industrial flue gases.

Knippegroen DFDS