In the heart of the Ghent port area, a crucial link in the Flemish-Dutch industry, Elia will this year start the construction of a new high-voltage substation: Baekeland. The project marks a major milestone in the region's energy transition.

The station, which will handle a voltage of 380/150kV, will be strategically located between the coast and the ports of Ghent and Antwerp. This will make it an essential node in the Belgian electricity backbone. Preparatory works on the 15-hectare site have now been completed. The commissioning of the first substations is scheduled for 2030.

With Baekeland, port of Ghent and surrounding industries will have access to a more robust and sustainable electricity grid. This means, among other things, a better connection to green power from the North Sea, which will significantly accelerate electrification and CO₂ reduction in the region.

Other news

Map-it CCU final event, partner Smart Delta Resources1

Report final event Map-it CCU: from vision to action for a sustainable industry

On 27 May 2025, the final event of the Map-it CCU project took place at the historic St Peter's Abbey in Ghent. The event was completely full, confirming the great interest in Carbon Capture, Utilisation & Storage (CCUS).

zr

Sustainable mega projects from Smart Delta Resources partners approved by European Innovation Fund

It concerns ArcelorMittal (ZestA), ENGIE/Equinor (H2BE) and previously TotalEnergies/Zeeland Refinery (EnergHys) and Air Liquide (Elygator).

vlissingen oost

Vopak prepares for import of green ammonia in North Sea Port, the Netherlands

In response to the growing demand for sustainable raw materials and energy, preparations are currently being made at Vopak Terminal Vlissingen for the storage of green ammonia.